0.5 µSv/h

protection level outside the cabinet

300 kV

X-ray sources up to

20 mm

lead in the beam direction

16 weeks

from order to delivery

Customised. Fast. Affordable.

Customised.

Every cabinet is designed around your X-ray source, your parts and your room. Standard sizes are the starting point; length, doors, window and cable ports are adapted per project.

Fast.

16 weeks from order to delivery. We design from proven steel–lead–steel modules and bolt them together on site, without welding.

Affordable.

The lead goes where the beam points: 20 mm in the beam direction, less elsewhere. Standard modules and no building work keep the price down.

How we build.

Shielding for your source

We lay out the lead for the tube, power and beam direction you use – microfocus, liquid-metal-jet or high-power sources. Thicker where the beam points, lighter elsewhere.

Steel–lead–steel modules

Lead sheets sandwiched between steel, delivered as modules and bolted on site. No welding, so a cabinet can be moved later.

The complete safety chain

Door interlock, warning lamps inside and outside, emergency stops and key switch, wired to your X-ray controller and ready for acceptance.

From enquiry to acceptance

  1. You send us source, parts and room
  2. We design shielding and layout and send the offer
  3. The modules are produced
  4. Delivery 16 weeks from order, then installation on site
  5. Acceptance with your radiation protection officer

Questions and answers

Which X-ray sources can a BliXray cabinet house?

Any source up to 300 kV – microfocus, liquid-metal-jet or conventional tubes. The shielding is laid out for the source you choose.

What protection level do the cabinets reach?

0.5 µSv/h outside the cabinet. The value is confirmed by measurement at acceptance of each installation.

Do you also supply the X-ray system?

The cabinet is offered on its own. If you wish, we integrate the X-ray source, detector and manipulator you select.

Can a cabinet be moved to another room later?

Yes. The modules are bolted, not welded, so the cabinet can be dismantled and rebuilt.

How long does a cabinet take?

16 weeks from order, including delivery.

What decides the price?

Size, source voltage and power, doors and options. Tell us your source and room and you receive an offer for your layout.